Skate Park Reconstruction and Parking Improvements

aerial view of skate park future designskate park design rendering from staging areaskate park design rendering from entry areaskate park rendering from stairsskate park rendering with spectators and rampskate park rendering from entrance to flow bowlskate park rendering with spine and ramp in foregroundskate park rendering with flow bowl in foregroundskateboarder at current skate parkaerial view of skate park current and future locations

Conceptual rendering of future skate park design as of January 2023.

Conceptual rendering of future skate park design as of January 2023.

Conceptual rendering of future skate park design as of January 2023.

Conceptual rendering of future skate park design as of January 2023.

Conceptual rendering of future skate park design as of January 2023.

Conceptual rendering of future skate park design as of January 2023.

Conceptual rendering of future skate park design as of January 2023.

Conceptual rendering of future skate park design as of January 2023.

Project Description

Lenexa’s skate park relocation and reconstruction was identified as part of the Parks Master Plan and has been a high-priority project for many years.

The current skate park is over 20 years old and the surface has deteriorated significantly. The parking lot that serves this skate park, tennis courts and roller hockey rink is set up poorly and has limited capacity. This project will reconfigure the lot to accommodate more parking stalls, better traffic flow, and safer pedestrian movements.  

The skate park’s new design will be driven by community input to meet a wide range of recreational level usage. It will provide a safe environment for people of all ages and abilities to meet and share experiences through action sports (skateboarding, BMX, scooters, wheelchairs and inline skating). 

The facility will be renamed Rolling Magic Skate Park. This is in a tribute to a privately-run skate park with the same name that was built in Lenexa in the late 1970s.

Whether you're ready to kick-flip, grind, grab or just ride, Lenexa’s reconstructed skate park will be ready by fall 2023.

Location

87th Street Parkway and Greenway Lane, within Sar-Ko-Par Trails Park

Cost & Funding Sources

Total cost: $1,000,000 

Funding sources:

  • Combination of local funding

Timeline

Design: Summer 2022 through early 2023

Construction: Spring through summer 2023

Designer & Contractor

New Line Skateparks will design and build the skate park.

Project Updates

Fall 2023

Sept. 12: Rolling Magic Skate Park Grand Opening

Spring 2023

May 30: Existing skate park is closed and unavailable for use through mid-September.

April 24: Construction begins.

Winter 2023

Jan. 3: Final design concept of future skate park presented at Lenexa City Council meeting.

Fall 2022

Sept. 7–21: Online survey on preferences for new skate park design.

Sept. 7: Community Design Workshop #2 sought input on new skate park design concepts.

Summer 2022

July 21–Aug. 4: Online survey on preferences for new skate park design.

July 21: Community Design Workshop #1 sought input on amenities for new skate park design.

June 7: City Council approved contract with New Line Skateparks to design and build skate park. 

 

Public Involvement

Community Design Workshop 1:

  • Workshop: Thursday, July 21, 2022, from 6–7:30 p.m. at Thompson Barn, 11184 Lackman Rd., Lenexa, KS 66219

  • Online survey: Available July 21–Aug. 4, 2022

Community Design Workshop 2: 

  • Workshop: Wednesday, Sept. 7, 2022, from 6–7:30 p.m. at Thompson Barn, 11184 Lackman Rd., Lenexa, KS 66219

  • Online survey: Available Sept. 7–21, 2022

Discussions with various stakeholders and interest groups

  • Multiple